Long Duc 3
Industrial Park

Green Carbon Neutral

The latest project in Dong Nai City.
A next-generation industrial park designed
for a carbon-neutral future.

Download brochure

About Us

Long Duc 3 Industrial Park is a next-generation industrial park developed by Sojitz Group of Japan, following the success of Loteco Industrial Park and Long Duc Industrial Park in Dong Nai City, Vietnam.
With over 30 years of experience in industrial park development and operation in Vietnam, Sojitz brings a trusted global network, strong operational expertise, and long-term commitment to sustainable industrial growth.
Strategically located in Dong Nai City, Long Duc 3 Industrial Park is designed for the future — combining modern infrastructure, stable utilities, and comprehensive one-stop support services for investors.
Driven by the vision of carbon neutrality, the project promotes renewable energy, green landscapes, and environmentally responsible development to create a sustainable and future-ready industrial ecosystem.
Long Duc 3 Industrial Park — Powering Sustainable Growth for the Next Generation.

Long Duc 3 Industrial Park

Development Schedule

TIMELINE

April 2026

Industrial Park Construction Begins
(Phase 01)

February 2027

Industrial Park Completion (Phase 01)
and Handover

February 2027 onwards

Industrial Park Construction Begins
(Phase 02)

WTP Worker Housing Service Center WWTP Retention Pond 110kv/22kv Substation Electric House Gas Station PCCC Retention Pond

* Hover over the icon for more details.

  • Development Area 245ha
  • Phase 01 145ha
  • Phase 02 100ha
  • Sales Area 180ha
  • Rental Factory Area 5ha
  • 01 WTP
  • 02 Worker Housing
  • 03 Service Center
  • 04 Retention Pond
  • 05 WWTP
  • 06 PCCC
  • 07 Gas Station
  • 08 Electric House
  • 09 110kv/22kv
    Substation
  • 10 Retention Pond

Location

Long Duc 3 Industrial Park is strategically located in Dong Nai City, offering excellent access to major ports and airports. The extensive transportation network helps optimize logistics costs and enhance business competitiveness.

  • 45mins

    Ho Chi Minh City

  • 35mins

    Cat Lai Port

  • 35mins

    Phuoc An Port

  • 55mins

    Cai Mep -
    Thi Vai Port

  • 15mins

    Long Thanh
    International Airport

  • 10mins

    Long Duc
    Industrial Park

* Hover over the icon
for more details.

* Touch the icon for more details.

Tan Son Nhat
International Airport

Tan Son Nhat International Airport

Situated about 40 km (about 70 minutes by car) from Tan Son Nhat International Airport, which is located 7 km from central Ho Chi Minh City and offers numerous international flights to major Asian, European, and American cities.

Ho Chi Minh City

Ho Chi Minh City

Located approximately 45 minutes by car from central Ho Chi Minh City (via the Ho Chi Minh City – Dau Giay Expressway), this site offers a strategic advantage for recruiting high-caliber Vietnamese staff living in the city center. Furthermore, accessibility is expected to improve even further in the future with the planned Metro extension and the development of ring roads.

Cat Lai Port

Cat Lai Port

Located approximately 25 km (about 35 minutes by car) from Cat Lai Port. As Vietnam's largest container port in Ho Chi Minh City, it serves as an import/export hub used by many foreign companies, not just Japanese manufacturers, offering strong logistics capabilities to the Ho Chi Minh City side. It provides a stable logistics environment suitable for a wide range of industries including electronic components, precision equipment, and general manufacturing.

Long Duc Industrial Park

Long Duc Industrial Park

Located approximately 7 km (about 10 minutes by car) from Long Duc Industrial Park, which was completed in 2013 and had all its land plots sold out by 2019. A large number of manufacturing companies, primarily Japanese, are located there, allowing for the utilization of existing industrial clusters and a stable infrastructure environment.

Long Thanh
International Airport

Long Thanh International Airport

Scheduled to open in 2026 as a national project to become Southeast Asia's hub airport, Long Thanh International Airport is located approximately 10 km (about 15 minutes by car) away. Comprehensive developments including commercial, logistics, and residential facilities are also planned, anticipating regional growth and population increase.

Phuoc An Port

Phuoc An Port

Located approximately 25 km (about 35 minutes by car) from Phuoc An Port, which opened in 2024. As the largest port in the south, similar to Cai Mep - Thi Vai Port, it is equipped to accommodate large vessels.

Cai Mep - Thi Vai Port

Cai Mep - Thi Vai Port

Located approximately 35 km (about 55 minutes by car) from Cai Mep - Thi Vai Port, which has a depth of 14m and can accommodate large vessels weighing over 100,000 tons.

Infrastructure

Decarbonization Solutions

We provide our tenants with low-carbon and decarbonization solution services through the installation of rooftop solar panels and the supply of compressed natural gas (CNG) via on-site underground pipelines.

Stable Infrastructure Supply

Expert staff are stationed 24 hours a day, 365 days a year at each power, water supply, and drainage infrastructure facility, ensuring a system capable of an immediate response in the event of an emergency.

High-Quality
Support

We provide comprehensive expansion support in multiple languages, from the initial feasibility study stage to move-in. After occupancy, we offer meticulous, Japan-standard operational support, including information sharing through monthly tenant meetings.

Before Move-in

  • 01

    Surveys Cooperation

    Surveys Cooperation

    Support to conducting various surveys when in phase of investment evaluation.

  • 02

    Establishment Support

    Establishment Support

    Support for preparing company incorporation documents and filing the application on your behalf.

  • 03

    General Licensing Support

    General Licensing Support

    Guidance on required licenses and application procedures.

  • 04

    Law Introduction

    Law Introduction

    Introduction to accounting firms, law firms, etc.

After Move-in

  • 01

    Infrastructure Supply

    Infrastructure Supply

    Stable supply of electricity, water, drainage, gas, and telecommunications ensured through 24/7 maintenance and regular inspections by professional staff.

  • 02

    Information Sharing

    Information Sharing

    Monthly tenant meetings held as a platform for information sharing and community engagement.

  • 03

    Multilingual Support

    Multilingual Support

    On-site staff provide support in multiple languages for any questions after move-in.

  • 04

    Document Support

    Document Support

    We assist with the preparation and submission of Investment Registration Certificates and Business Registration Certificates.

Company Profile

Project

Long Duc 3 Industrial Park

Location

Dong Nai City, Vietnam

Company name

Long Duc 3 Industrial Park
Joint Stock Company

Shareholders

  • Sojitz Corporation: 70%
  • Long Thanh Golf
    Investment and Trading
    JSC: 25%
  • Nam Viet Long Investment
    and Development JSC: 5%

Total Land Area

245 hectares

Area for Sale

180 hectares

Download brochure

Download

Regarding the Handling of Personal Information

This website will not disclose or provide your personal information to any third party without your consent. We may request and use your personal information to provide services to you, but it will not be used for any other purpose.